Developed agriculture infrastructures are:

Agriculture Road/Aquaculture and Bridge
Project Location
Length (KM)
Construction Cost (RM)
Pengeli Kecil
2.5
100,000
Bukit Saga
18.5
7,448,942
Bukit Lawiang
9.2
2,615,284
Sg. Cemaran I
1.2
373,682
Sg. Cemaran II
3.0
653,341
Sg. Semberong Kiri
11.6
5,416,822
Semenchu-Sg Lebam
4.0
871,121
Sedili Kecil
10.0
7,253,070
Drainage System
Project Location
Length (KM)
Construction Cost(RM)
Sg. Cemaran II
2.0
25,000
Bukit Saga
4.0
50,000
Electric Supply
Project Location
Length (KM)
Construction Cost(RM)
Sg. Cemaran II
1.2
100,000
Pengeli Kecil
2.5
350,000
Storage Accommodation/Stall
Project Location
Unit
Construction Cost (RM)
Hentian Penawar
14
1,500,000
‘Foodpark’
4
1,878,773

 