Developed agriculture infrastructures are:
|
|
Agriculture Road/Aquaculture and Bridge
|
|
|
Project Location
|
Length (KM)
|
Construction Cost (RM)
|
| Pengeli Kecil |
2.5
|
100,000
|
| Bukit Saga |
18.5
|
7,448,942
|
| Bukit Lawiang |
9.2
|
2,615,284
|
| Sg. Cemaran I |
1.2
|
373,682
|
| Sg. Cemaran II |
3.0
|
653,341
|
| Sg. Semberong Kiri |
11.6
|
5,416,822
|
| Semenchu-Sg Lebam |
4.0
|
871,121
|
| Sedili Kecil |
10.0
|
7,253,070
|
|
|
|
|
Drainage System
|
|
|
Project Location
|
Length (KM)
|
Construction Cost(RM)
|
| Sg. Cemaran II |
2.0
|
25,000
|
| Bukit Saga |
4.0
|
50,000
|
|
|
|
|
Electric Supply
|
|
|
Project Location
|
Length (KM)
|
Construction Cost(RM)
|
| Sg. Cemaran II |
1.2
|
100,000
|
| Pengeli Kecil |
2.5
|
350,000
|
|
|
|
|
Storage Accommodation/Stall
|
|
|
Project Location
|
Unit
|
Construction Cost (RM)
|
| Hentian Penawar |
14
|
1,500,000
|
| ‘Foodpark’ |
4
|
1,878,773
|
|